Try adjusting your filters or create a new work order.
Work Order
Status
Elevations
Loading…
No elevations yet.
Job
Job #
—
Job Name
—
Division
—
Project Manager
—
Superintendent
—
Work Order
—
Auto-set from the earliest elevation date
– h
Assigned Workers
Checklist
Loading steps…
Shop Drawings
Uploading…
No drawings attached.
Job Documents
Loading…
No documents yet.
PDF, Excel, Word, image or text — up to 25 MB.
New Work Order
Step 1 of 3 — Work order details
Work Order
Elevations
Doors & Frames
Import from ExcelOptional — upload a WO sheet to autofill elevations
Division: —
Optional — replaces the auto “R#” in the release label.
Add any elevations for this work order. Leave the table empty and click Skip to proceed without elevations.
Tag
Type
System
Qty
Date Requested
Assemble
Existing Configurator Openings
Openings already built in the Configurator for this job and not on a work order.
Tick the ones this work order will produce, then click Finish to attach them.
Unticked openings can be attached or moved later from the Door Schedule.
Each row creates Door and/or Frame elevations with Programmed → CNC → Assembled stages.
Leave the table empty and click Skip to finish without doors or frames.
Tag
Leaves
Include Frame
Date Requested
Add Elevation
Add Elevations
Tag
Type
System
Qty
Date Requested
Assemble
Door / Frame Schedule
Configurator Openings
Linked to this work order. Detach one to move it to another work order
(not possible once production has started on it).
Openings already built in the Configurator for this job and not on a work order.
Attach one to create its elevations here — no need to re-enter the tag.
Each row creates Door and/or Frame elevations with
Programmed → CNC → Assembled stages.
Matching a door to a frame with the same tag links them visually.
Tag
Leaves
Include Frame
Date Requested
Upload Cutlist
For lineal cut-list lines not sourced from the door/frame configurator
(e.g. curtainwall/storefront). Merges into this work order's CutFlow job
alongside anything already released from the configurator.
Changes apply to the job and every work order and reservation under it.
Reorder Shop Queue
Priority is normally derived from each work order's due date. Drag to override —
moved work orders get pinned and the nightly recalc leaves them alone.
Date Requested
No date requested was set for any elevation. Enter a date to apply to all elevations, or leave blank to skip.
Create New Job
Elevation Complete?
All stages are done — mark this elevation as complete?
Reopen Elevation?
This elevation was marked complete. Reopen it as in-progress?
Bulk Complete
Place Work Order On Hold
Mark Work Order Complete?
All elevations and work-order steps are complete. Mark this work order as complete?
Send Completion Email?
Email the project manager and admins that this work order is complete?